Lifting Guides & Planning Calculators
Choose a planning topic or a calculator. Each guide keeps its scope and assumptions visible; each tool includes a worked example and an interactive form.
- Lifting Supervisor Malaysia
- Rigger & Rigging Coordination
- Crane Lifting Planning
- Heavy Lifting Planning
- Critical Lift Planning
- Kerja Mengangkat: Panduan Perancangan
- Lifting Plan Guide & Draft Template Builder
- Lifting Manpower Supply Malaysia
- Rigging Calculator & 3D Planner
- Two-leg sling tension Calculator
- Sling length & headroom Calculator
- Tagline length Calculator
- Boom length & angle Calculator
- Offset COG load share Calculator
- Combined centre of gravity Calculator
- Plate / solid block mass Calculator
- Hollow pipe mass Calculator
- Total suspended mass Calculator
- Pad bearing pressure Calculator
- Crane chart utilisation Calculator
- Mass & force converter Calculator
Continue planning
Planning information, not lift approval. Confirm applicable Malaysian and project requirements with the responsible parties. No appointment or booking is made automatically.
ASME / PDF LIBRARY
Original English PDFs.
Browse five supplied ASME documents covering cranes, slings, rigging hardware and ropes. Open or download the original English PDFs.
LFS3 · Muat turun PDF
References / Rujukan
Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.
Malaysia — JKKP / DOSH
Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.
- JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak
Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.
- JKKP: Kerja Mengangkat dengan Selamat — poster guidance
Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.
- JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)
Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.
No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.
International — background and manufacturer information
- UK HSE: Planning and organising lifting operations
UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.
- Crosby: 2016 catalog sling-angle reference (PDF)
Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.
- Liebherr: Crane Planner mobile
Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.
International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.
Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.