CALCULATION OUTPUT
Compare a chart-compatible load with capacity.
Obtain capacity from the correct chart and configuration. Demand must use the same gross/net convention after relevant deductions. The remaining margin is arithmetic only, not a statement that other operating limits have been satisfied.
Enter project-specific values in the form below. Blank or out-of-range inputs stop the calculation. Reset restores the illustrative example, not verified project data. You can copy or download a result and add a snapshot to a draft lifting plan.
Utilisation = demand / chart capacity × 100; remaining margin = capacity − demand.No crane charts are supplied or inferred. Use the exact model, radius, boom, counterweight, outrigger setup, operating sector and manufacturer deductions. A result below 100% is not lift approval; project limits may be lower.
Chart utilisation: 62.5 %; Arithmetic remaining margin: 3000 kg.
This example illustrates the calculation method only. It is not equipment selection or a recommended operating arrangement.

CALCULATION OUTPUT
Check units and source data independently. Preserve the assumptions with the result when sharing it; a detached number can be misinterpreted. Changes to the load or equipment configuration require the calculation and surrounding plan to be reviewed again.
Planning information, not lift approval. Confirm applicable Malaysian and project requirements with the responsible parties. No appointment or booking is made automatically.
Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.
Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.
Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.
Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.
Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.
No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.
UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.
Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.
Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.
International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.
Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.