DOCUMENTATION / DRAFT WORKSPACE

PLAN THE LIFT.
DOCUMENT THE DETAILS.

Build a reviewable lifting plan. Keep calculations, site information and supporting documents together.

Plan entries and supporting files autosave on this device. Preview and download the complete PDF with your drawings, calculation records and OEM charts.

AI concept of a lifting planning desk
DRAFT — FOR REVIEW

This workspace does not approve a lift, verify equipment certificates or replace competent site-specific planning. Complex lifts require specialist planning. Blank fields and unchecked documents remain outstanding in the PDF.

Review before use.

Confirm the plan against actual equipment, site conditions and applicable project requirements. The exported draft includes unsigned review spaces, not electronic approvals.

Planning background: HSE guidance ↗

General planning reference, not a statement of Malaysian regulatory compliance.

Lifting guides & tools

Explore practical planning topics and worked calculation examples.

References / Rujukan

Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.

Malaysia — JKKP / DOSH

Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.

  • JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak

    Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.

  • JKKP: Kerja Mengangkat dengan Selamat — poster guidance

    Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.

  • JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)

    Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.

No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.

International — background and manufacturer information

  • UK HSE: Planning and organising lifting operations

    UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.

  • Crosby: 2016 catalog sling-angle reference (PDF)

    Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.

  • Liebherr: Crane Planner mobile

    Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.

International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.

Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.

Lifting plan PDF

Open PDF in a new tab ↗

Discuss your lift