Lifting Crew & Manpower Supply Malaysia
Discuss lifting crew and manpower requirements with Abdul Salam Zulmajdi. Enquire about individual lifting supervisors, riggers, crane operators or signalmen, or discuss a full crew for construction, data centre, power plant or industrial projects.
Share the site, dates and number of people needed for work in Malaysia or overseas. Scope, suitability and availability are confirmed for each assignment.

Explore lifting crew profiles
Browse lifting supervisor and rigger / signalman profiles, shortlist people for your project and send an availability enquiry. Resumes and supporting documents are shared according to each profile owner's permission.
Choose individual roles or a full crew
A lifting supervisor coordinates the assigned lifting operation within the project responsibilities. Riggers support the agreed attachment and load-handling arrangement. Crane operators operate the specified equipment within their appointment. Signalmen provide the agreed communication interface. A full-crew request should describe the required mix rather than assume one standard team fits every lift.
Provide assignment requirements
State the country and site location, crane type and model, work environment, proposed shift pattern, duration, language or communication needs and the client’s appointment and competency requirements. Specify how many personnel are required for each role. For a full team, describe the work sequence and simultaneous activities so the role mix can be discussed.
Confirm before mobilisation
Use the enquiry form to select roles and enter the total headcount, then add the per-role breakdown in the scope. Supply is subject to availability and project review. Personnel documents, suitability for the equipment and site, responsibilities, commercial terms and mobilisation arrangements require confirmation; submitting the form does not reserve a team.
Discuss lifting crew requirements
Planning information, not lift approval. Confirm applicable local and project requirements with the responsible parties. No appointment or booking is made automatically.
References / Rujukan
Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.
Malaysia — JKKP / DOSH
Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.
- JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak
Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.
- JKKP: Kerja Mengangkat dengan Selamat — poster guidance
Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.
- JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)
Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.
No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.
International — background and manufacturer information
- UK HSE: Planning and organising lifting operations
UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.
- Crosby: 2016 catalog sling-angle reference (PDF)
Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.
- Liebherr: Crane Planner mobile
Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.
International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.
Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.