Lifting Plan Preparation in Malaysia

Abdul Salam Zulmajdi prepares crane lifting plans for project review. Agree the crane layout, rigging details, lift sequence and drawings you need before work starts.

Enquire about mobile and crawler crane lifts, including heavy, critical and tandem lifts in Malaysia or overseas.

Request a Lift Plan Call SalamPrepare a project brief

What your lift plan can include

Salam prepares the agreed drawings and draft plan for project review. The appointed project parties check the actual crane and rigging, verify ground and site conditions, and authorise the lift.

Project experience and sample drawings

For CR3 Malaysia’s ARDS project, Salam supported lifts with 25 t to 220 t cranes and prepared lifting plans for client approval. His project record also includes planning and critical lift coordination during a Siemens Energy steam turbine overhaul in the Philippines. View the CR3 project.

For an example of rigging coordination during a power plant overhaul in Malaysia, see the TNB Prai project.

The separate 400 t crawler drawing sample illustrates crane elevation, site layout and rigging across three sheets. Browse sample lifting plans.

What to share for a quote

Start with the site, planned dates, load description and what you want the plan to cover. Add known dimensions, load weight and the proposed crane if you have them. Share only non-confidential details in your first message and agree how to exchange restricted drawings or documents.

Concept visual for crane lift planning

Build a configuration record

Record crane model and chart revision, boom and jib arrangement, counterweight, outrigger setup, operating sector and proposed radii. Include the pick and landing positions and intermediate movement. Read chart notes for deductions and operating restrictions; do not mix gross capacity and net load conventions.

Treat ground as a separate assessment

Obtain applicable outrigger reactions and site ground information. The pad calculator divides a reaction by an effective contact area; it does not establish ground capacity or mat strength. Underground services, excavations, uneven support and settlement require assessment beyond an average pressure number.

Prepare for review

Attach a site layout, travel and access constraints, load inventory and the exact chart reference. Keep assumptions visible and mark unknown inputs for follow-up. Use the utilisation calculator only after matching demand and capacity conventions. A percentage below 100 is not permission to carry out the operation.

Planning guides and tools

Use these tools to organise information for review by the responsible project parties.

References / Rujukan

Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.

Malaysia — JKKP / DOSH

Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.

  • JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak

    Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.

  • JKKP: Kerja Mengangkat dengan Selamat — poster guidance

    Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.

  • JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)

    Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.

No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.

International — background and manufacturer information

  • UK HSE: Planning and organising lifting operations

    UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.

  • Crosby: 2016 catalog sling-angle reference (PDF)

    Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.

  • Liebherr: Crane Planner mobile

    Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.

International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.

Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.

Discuss your lift