Heavy Lifting Planning

Heavy lifting discussions need more than a large weight. Dimensions, centre of gravity, travel path, lifting points and the space available for assembly can be just as important to the plan. There is no universal weight boundary used by this website to classify a lift as heavy.

AI concept visual for lifting planning

Establish the load evidence

Start with a reliable mass source and identify anything excluded from it: contents, temporary steelwork, attachments or rigging. Record the centre of gravity and how it was determined. Shape-based calculators provide estimates, not certified weights; compare estimates with reliable manufacturer or measurement records.

Plan the interfaces

Describe delivery orientation, unloading location, crane setup, rigging assembly space and final landing supports. Include access routes and adjacent work. A change in orientation or landing position can change the required arrangement, so provide drawings with dimensions rather than only a general site photograph.

Package the enquiry

Send a concise scope, location, schedule and available drawings. Identify unresolved engineering questions and the project’s review owners. This site can help organise calculations and draft documentation for discussion; specialist engineering, equipment selection and execution arrangements must be confirmed separately.

Continue planning

Planning information, not lift approval. Confirm applicable Malaysian and project requirements with the responsible parties. No appointment or booking is made automatically.

References / Rujukan

Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.

Malaysia — JKKP / DOSH

Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.

  • JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak

    Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.

  • JKKP: Kerja Mengangkat dengan Selamat — poster guidance

    Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.

  • JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)

    Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.

No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.

International — background and manufacturer information

  • UK HSE: Planning and organising lifting operations

    UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.

  • Crosby: 2016 catalog sling-angle reference (PDF)

    Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.

  • Liebherr: Crane Planner mobile

    Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.

International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.

Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.

Discuss your lift