Plan the operation
JKKP’s safe-lifting guidance covers risk assessment, lifting plans, suitable equipment, trained personnel and supervision. Read JKKP safe-lifting guidance ↗
DRAWING PORTFOLIO / 02 · MALAYSIA
Seven-page pipe lifting sample
Seven pages bringing together crane arrangement, rigging documentation and calculation records. Explore the supplied format alongside Malaysian JKKP / DOSH planning references.
SUPPLIED DOCUMENT / SAMPLE FORMAT
THE SAMPLE AT A GLANCE
Issued for review / approval — sample format
Contoh format lifting plan untuk rujukan di Malaysia. Status kelulusan dan kiraan perlu disahkan bagi setiap kerja sebenar.
Document figures: 800 kg pipe + 630 kg hook block + 10 kg rigging = 1,440 kg. The ratio 1,440 ÷ 2,700 × 100 is 53.33%; this is an arithmetic comparison, subject to verification of the actual crane configuration and applicable chart deductions.
Some angle, hitch and reeving entries in the supplied PDF require review before operational use. The original PDF is reproduced unchanged and does not show JKKP approval.
SEVEN PAGES / ONE SUPPLIED EXAMPLE
Choose a page, zoom into the details,
or open the original document.







Drag to pan when zoomed. Use the arrow keys to scroll the focused page.
KEEP THE ORIGINAL
Original supplied PDF · 7 pages · approximately 1.1 MB
MALAYSIA / JKKP · DOSH REFERENCES
Format contoh ini boleh membantu susun dokumen. Keperluan kerja sebenar mesti dirujuk kepada pihak projek dan sumber JKKP yang terpakai.
JKKP’s safe-lifting guidance covers risk assessment, lifting plans, suitable equipment, trained personnel and supervision. Read JKKP safe-lifting guidance ↗
Record the verified load, crane configuration, radius, lifting accessories, ground conditions, work sequence and responsibilities. DOSH supervisor training module (2017) ↗
Confirm manufacturer data, sling-angle definitions, hitch ratings, reeving and the project review process. DOSH rigging training module (2017) ↗
These are official reference links, not an endorsement of this example. The supplied format is not presented as a mandatory JKKP template, a calculation certification or an approved lifting plan.
YOUR NEXT PROJECT
Share the load, crane configuration, site layout and timing to discuss project-specific lifting documentation.