Rigger & Rigging Coordination
Rigging coordination connects the load information, attachment arrangement and people carrying out the work. A rigger enquiry is more useful when it describes the actual load and connections than when it simply requests a number of personnel. Personnel availability and appointment requirements need separate confirmation.

Describe the load and connections
Supply verified mass, dimensions, centre of gravity and the location and suitability of lifting points. Note sharp edges, delicate finishes and restrictions on how the load may be supported. A photograph helps discussion but does not establish the capacity of a lifting point.
Record the arrangement
List sling type, effective lengths, identification and ratings, shackle connections and any lifting beam. Record hitch arrangement and angles using a clearly stated convention. The two-leg calculator reports static tension for a symmetric arrangement; it does not select accessories or account for every hitch reduction.
Coordinate people and movement
Agree the signal arrangement, attachment and release sequence, landing supports and access controls. Brief the team on the planned route and stop-work conditions. If the load or arrangement changes, return the change for review rather than treating an earlier calculation as continuing approval.
Continue planning
Planning information, not lift approval. Confirm applicable Malaysian and project requirements with the responsible parties. No appointment or booking is made automatically.
References / Rujukan
Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.
Malaysia — JKKP / DOSH
Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.
- JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak
Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.
- JKKP: Kerja Mengangkat dengan Selamat — poster guidance
Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.
- JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)
Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.
No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.
International — background and manufacturer information
- UK HSE: Planning and organising lifting operations
UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.
- Crosby: 2016 catalog sling-angle reference (PDF)
Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.
- Liebherr: Crane Planner mobile
Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.
International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.
Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.