A lifting plan should communicate the proposed operation and the responsibilities around it. A blank template is only a starting point: useful documentation records the particular load, site, equipment and work sequence. Our browser-based builder organises those details into a watermarked draft PDF for review.

AI concept visual for lifting planning

Gather information before filling the form

Collect the project reference and revision, verified load data, lifting-point details, crane configuration and applicable chart. Prepare a layout or drawing showing the setup and movement. Record ground and rigging assumptions explicitly and identify missing information instead of presenting estimates as verified facts.

Use the six-step builder

Enter project and load information, equipment and site details, work sequence and review information. Add calculation snapshots from the Calculator Hub and attach supported images or PDF documents. Snapshots retain their input and assumptions: they do not automatically populate every plan field or validate the complete operation.

Save, export and review

Download the editable project file before closing the tab, then import it to resume. Export a PDF bearing the LS logo, revision, page numbers and website watermark. Every document remains DRAFT — FOR REVIEW, including attachments. The builder does not provide electronic approval or an interactive site-diagram editor; upload drawings as attachments.

Continue planning

Planning information, not lift approval. Confirm applicable Malaysian and project requirements with the responsible parties. No appointment or booking is made automatically.

References / Rujukan

Choose Malaysian sources or international background. Source links checked: . This is the check date, not the publication date.

Malaysia — JKKP / DOSH

Rujukan tempatan untuk menyusun pelan, peranan pasukan dan semakan jentera. Bezakan bahan latihan lama daripada peraturan dan proses semasa; semak keperluan yang terpakai dengan pihak projek dan JKKP.

  • JKKP: Reka Bentuk Jentera Mengangkat Selain Lif, Eskalator dan Laluan Gerak

    Official process guidance referring to the 2024 plant certificate-of-fitness regulations. Use this starting point to check applicable design-verification and machinery requirements, including scope and exclusions. A calculation or draft plan here does not establish registration or certificate status.

  • JKKP: Kerja Mengangkat dengan Selamat — poster guidance

    Safety-awareness guidance; not a consolidated legal text. Organise risk assessment, a lifting plan, suitable equipment, trained personnel and supervision. The team overview distinguishes the supervisor, crane operator, rigger and signalman roles.

  • JKKP: Modul Latihan Penyelia Mengangkat (PDF, approximately 25 MB)

    Historical training module dated 30 October 2017. Its planning chapter helps organise load information, crane arrangement, accessories and team responsibilities. The 2025 upload path is not the document date; check older legal references against current requirements.

No fixed inspection interval or universal critical-lift threshold is asserted here. Confirm the actual machine, personnel appointments and site requirements before the operation.

International — background and manufacturer information

  • UK HSE: Planning and organising lifting operations

    UK regulator guidance. Useful background on proportionate planning, responsibilities, supervision and foreseeable risks. It is not Malaysian legislation.

  • Crosby: 2016 catalog sling-angle reference (PDF)

    Manufacturer technical background, historical catalog. Use for the stated sling-angle relationship, not to select current equipment ratings. Confirm the applicable product instructions, hitch and configuration with the actual manufacturer.

  • Liebherr: Crane Planner mobile

    Manufacturer planning service. Configuration-specific crane information is separate from the manual arithmetic calculators on this website. We do not supply or infer its proprietary charts, and this link does not imply endorsement.

International material complements, but does not replace, applicable Malaysian requirements or project review. Tool-specific method references remain alongside each calculator.

Independent reference directory. No JKKP/DOSH, HSE or manufacturer endorsement; no automatic compliance certification or lift approval.

Discuss your lift