Tools/Rigging Studio 3D

HITCH & LOAD PLANNING

Rigging Calculator & 3D Planner

Choose the load. Build the rig. Explore every angle.

Live 3D geometry
Geometry · Hitches · Load cases

Open Hitch & Load ↓Tandem & Critical Lift Planner ↗

YOUR LOAD LIBRARY

Start with the right shape.

30 models
Box / crateOriginal generic models · dimensions and lifting points are editable

LIVE WORKSPACE

The rigging view.

Preparing 3D…
Y ↑METRES
Centre of gravityCommon rigging nodeθ horizontal · β vertical · α included · χ choke

Node-centre scaffold geometry

Routed sling lengths appear below
SegmentLengthθ horizontalβ vertical

The geometry view shows node-centre measurements. Open Hitch & Load below for supported calculations, entered ratings and unresolved checks.

01

Define the load

Preset dimensions are editable examples. Enter verified dimensions and attachment locations for the actual load.

02

Position the rigging

Hook rise is measured above the highest load attachment.

Load attachment coordinates

X along length · Y above base · Z across width. Each leg length follows its own endpoints. Example points do not identify approved lifting locations.

03

Choose the components

Generic component dimensions are visual references. Segment lengths are measured between node centres and include the displayed hardware; no WLL, suitability or capacity is assigned.

04

Centre of gravity

Origin: centre of the load footprint, at its base. A centred COG is an editable example, not a stability or load-share result.

05

Export your plan

HITCH & LOAD CALCULATION

Give the geometry its data.

Enter the load, record each sling and compare supported static cases with the rating you supply.

Geometry ready

θ is measured from horizontal, β from vertical, α between branches, and χ at the choke. A physical basket sling has two loaded branches. Unsupported cases stay visible and unassessed.
For a worked example, open the Two-Leg Sling Tension Calculator or the Sling Length & Headroom Calculator.

Plan record Company, location & revision

Load & rigging weights

kg

Record rigging mass once at the level it is carried. Upper slings also support the beam and lower rigging; these are not added again to the lower sling demand.

User-declared load factor

1.00 represents the entered static mass. A higher user-declared factor needs a recorded basis; this does not simulate shock, acceleration or crane motion.

Inputs use kilograms, metres and millimetres as labelled; force results use kN. Open mass & force converter ↗ · Open mass accounting tool ↗. Review the source calculation and enter its verified result here; no formatted text is imported automatically.

Each physical sling

Upper and lower entries keep separate equipment data. Enter a rating from the actual product tag or chart and identify its basis. A manufacturer profile adjusts an entered rating; it does not supply a product capacity.

Opens a generic box with one physical sling in a direct arrangement. Your mass and rating entries remain for review; confirmation is cleared. Choose basket or choker in its entry.

CALCULATION RECORD

Inputs. Demand. Rating.

Open lifting plan builder ↗
Method, sources & unresolved checks

The PDF records geometry, inputs, equipment, source factors and unresolved items. Names record preparation/review details; they do not sign or approve the lift.

Rigging plan PDF

If the preview is unavailable, open the PDF in a new tab ↗.

Model & gear references

The models show generic geometry. Enter the dimensions, lifting-point positions, mass, COG and gear data for your actual load. Dimensions from an example catalogue do not establish a fitting match.

Method & references

Each reported sling segment joins two explicit node centres. Length = √(ΔX² + ΔY² + ΔZ²). θ = atan2(ΔY, √(ΔX² + ΔZ²)), measured from the horizontal plane; β is measured from vertical. α denotes an included angle between branches, while χ denotes the local choke angle; they are reported only where that definition applies. Upper and lower sling segments are listed separately. Moving an attachment, beam or hook changes the geometric length.

Direct bridles converge at one common hook. Spreader beams use two upper picks; lifting beams use a single central upper pick; four-point frames use four upper picks. These are schematic geometry arrangements. Hardware sizes are visual references, and node-centre lengths include hardware symbols. Aligning the hook above the COG does not calculate equilibrium or prove stability. Displayed legs do not imply equal load sharing. Enter actual project/OEM attachment data; this tool does not approve lifting points, hardware selection or lift execution.

Rigging background: Crosby historical sling-angle reference ↗ · Unirope: centre of gravity ↗

Discuss your lift