ADVANCED LIFT PLANNER

PLAN BOTH.
CONTROL EVERY PHASE.

Put the load, cranes and people in one plan. Compare each static checkpoint. Keep the evidence with the decision.

Excavator Lift PlanChart comparison · rated lifting point ↗

Tandem calculations cover two vertical reactions on a level rigid load. Pick-up, transfer and landing are static checkpoints. Tailing, upending, tilting and dynamic movement require a separate engineered method.

Tandem uses two independent crane entries. Select the same model twice or combine different models. Catalogue selection does not supply chart capacities. Use Custom for any model not listed.

LIFT CHECKPOINT VIEW

Two hooks. One picture.

SCHEMATIC

Showing both cranes. Choose Crane A or B to enlarge body, hook block, hook / link, rigging or shackle / lug details. Rigging shapes are representative; verify the actual sling, hitch, angles and WLL in the rigging plan.

The 3D camera changes the view only. PDF drawings show side, top and isometric views of the whole actual plan.

Reference examples

Rigid boom geometry links crane position, boom length, boom head and vertical hook line. The view compares layout radius with your chart entry. It does not assess OEM working envelopes, deflection, stability or collisions.

Drawing references

Tadano TR-250M-5, Kobelco 7250 and XCMG XGC400-I have detailed reference-shaped bodies, tracks or tyres, cab glazing, machinery and attached counterweights. Boom members and hook blocks are illustrated in 3D. Published model dimensions are applied where recorded, with the exact fields and sources shown above. Other components and unlisted custom cranes retain labelled generic proportions. Pins, linkage, reeving and details that are not published remain illustrative. Use Inspect crane with Body detail or Hook block detail to enlarge one machine. PDFs keep the whole actual plan. This page does not contain or redistribute original CAD files or photographs.

01

Record & load

Combined payload & COG

Payload includes all common rigging whose combined COG is declared here. Add each crane’s own hanging gear separately below. Count each mass once.

Calculation assumptions
02

Crane configuration

Use the actual model, configuration, operating sector, support setup and chart notes. No manufacturer chart capacity is supplied or inferred.

03

Lift checkpoints

Record the applicable capacity and radius at each static checkpoint. A transfer entry is a check at one position, not a simulation of moving two cranes.

04

Rigging & site records

These are recorded equipment and obstacle references. Entered sling WLL is not automatically converted into a hitch rating or compared against a crane reaction.

No Rigging Studio reference attached.

Obstacles & clearance notes

05

Critical controls

Record why this lift is critical using the applicable project or client criteria. No universal utilisation threshold is imposed by this tool.

Pre-lift evidence

HIRARC / risk controls

Method / work sequence

Document register

PDF document details & supporting sheets

Optional title-block details, logos, revision rows and attached site plans / OEM charts. These are saved on this device for the local PDF. Matching frozen-review PDFs use their recorded project details and attachment register.

06

Demand. Capacity. Evidence.

Missing inputs, assumptions & references

07

Prepared → Checked → Approved

Advanced lift plan PDF

Open PDF in a new tab ↗